Sea Link Ferry Terminal – Kangaroo Island
Date Posted: July 31, 2012
In 2012 Teg Consulting engineers where engaged to redesign the ferry terminal and optimise the structure. This was done and provided the client with substantial costs savings.
Sean Edwards undertook the design management, client liaison and contract management responsibilities for the project.