Michael Wanrooy was engaged as part of the Contract Administration Team (CAV) to manage the administration of the 2013 BMD/ACCIONA 13A NDRRA restoration package. The project involved the restoration of the Leichhardt Highway in the Banana Shire that had been nominated for 13A NDRRA Funding.
Our Involvement
TEG Consulting (Michael Wanrooy) was part of the Contract Administration Verification Team (CAV) managing BMD/ACCIONA undertaking 17 million restoration works on the Leichhardt Highway to meet TMR specifications and NDRRA requirements. TEG’s role was to provide Surveillance Engineer assistance.
The role includes:
- Scoping and verifying works on site as per the NDRRA phase 2 submission prior to construction;
- Assessment and recommendations of Contractors monthly claims; replying to Contractors Request for Information and corresponding via Notice to Contractors;
- Participating in monthly meetings and Contractors performance reviews;
- Management of TMR inspectors and CAV’s Site Engineers;
- Taking and recording preconstruction photos and post construction photos;
- Updating and maintaining the CAV’s team register;
- Providing technical advice, solutions, undertaking inspections;
- Providing quantity, quality, safety, traffic and environmental monthly metrics to the Principal; and
- Completing final phase 4 submissions to the QRA.
Project Outcomes
The BMD/ACCIONA Joint Venture has completed the 17 million restoration package meeting the deadline for NDRRA funding. The project was on time and met budget.
The final phase 4 submissions have been approved by the SPO and the QRA.
Key Personnel
-
Client Representative:Guru Balasubramanian
-
TEG Consulting Engineer:Michael Wanrooy
TEG Contact Details
-
Contact:
Sean Edwards
Contact Us
Ph: (07) 4061 8276
M: 0403 213 714 -
Offices:
Innisfail – Nth Qld
Townsville – Nth Qld
Rockhampton – Nth Qld