Project Data
-
RegionQueensland
-
LocationBowen
-
ClientGlencore
-
Duration / Date2014
-
Categories
Project Scope
TEG Consulting Engineers was engaged to assist in the redesign of the Bowen Coke Hot Car.
The existing Hot Car was at end of life and dilapidated, and also posed a number of safety risks due to the old design.
The role required the following:
- Assist Glencore in redesign of the Hot Car to meet current specifications.
- Look at innovation of the Hot Car to improve operation and safety aspects including mechanics & control room.
Our Involvement
TEG Consulting Engineers undertook design checks on all framing and equipment, provided advise on any issues.
Made recommendations to adopt MgO EPS board panels for the insulation of the control room and provided certification of all construction drawings:
- In addition provided assistance in addressing all RFI from fabricator.
- Provided on going advise to glencore as required during the fabrication process.
Project was completed successfully and the new hot car commissioned into operation.
Project Outcomes
The new Hot Car continues to operate efficiently to this day.
Key Personnel
-
Consulting Engineer:Sean Edwards
-
Client Representative:Robert Blyth
TEG Contact Details
-
Contact:
Sean Edwards
Contact Us
Ph: (07) 4061 8276
M: 0403 213 714 -
Offices:
Innisfail – Nth Qld
Townsville – Nth Qld
Rockhampton – Nth Qld