Northern NSW Flood Damage Stage 2 Remediation Program

FLOOD DAMAGE ASSESSMENTS STAGE 2


Project Data

  • Region
    Northern NSW
  • Client
    Johns Lyng Group
  • Duration / Date
    2022 – 2024
  • Project #
    TEGCE22096

Project Scope

The 2nd Stage of the Flood Damage Assessment program involved undertaking engineering design and prepare work methodologies to inform builders on undertaking remediation works. JLG engaged the services of TEG to undertake stage 2 management of various residential, commercial and industrial properties to prepare construction methodologies to remediate flood damage as part of the Flood Property Remediation Program.

The role required the following:

  • Review flood damage assessments undertaken by Stage 1 consultants. Interpret remediation required.
  • Prepare remediation works packages for builders/contractors to undertake the works involving engineering design, documentation and work methodologies.

Provide work packages that noted:

  • Design details and specifications.
  • Safe Work methods for works
  • Provide certification of the works
  • Review / Revisit properties to inspect as required to obtain additional information when required..
  • Provide management of flood remediation work packages in the form of a register to track roster works and reports.
  • Undertake all assessments in a safe manner in accordance with JLG’s Hammertech portal.
  • Regularly liaise with all stakeholders.

Our Involvement

TEG undertook flood damage remediation work packages and prepared the necessary work methodologies and documents including details and drawings for builder/ contractors to effect works.

Project Outcomes

TEG was engaged as the only consultant to undertake the Stage 2 works packages. TEG remains the last engineering consultant to continue undertaking inspections and issuing completion of work sign offs which continue as of March 2024.

Key Personnel

  • Consulting Engineer:
    Sean Edwards
  • Client Representatives:
    Sunny Bhardwaj, Johns Lyng Group

TEG Contact Details

  • Contact:

    Sean Edwards
    Ph: (07) 4061 8276
    M: 0403 213 714

    Contact Us
  • Offices:

    Innisfail – Nth Qld
    Townsville – Nth Qld
    Rockhampton – Nth Qld