Office Install to Processing Plant – AIC Copper

OFFICE POD


Project Data

  • Region
    North Queensland
  • Location
    McKinley
  • Client
    AIC Copper
  • Duration / Date
    March, 2024
  • Categories
  • Project #
    TEGCE24018

Project Scope

Design and check framing for installation for small collapsible office install to flotation platform processing plant.

Location of office pod to suite the existing frame of the wet plant steel frame grillage floor.

Our Involvement

TEG undertook full engineering design and documentation, liaising with client for demountable office.

Project Challenges

  1. Loading to existing framing
  2. Ensure no conflict with access walkways and services
  3. Ensure grating removed is replaced to prevent voids on platform

Project Outcomes

TEG provided engineering design to compliment the build layout and timber frame construction.

Key Personnel

  • Consulting Engineer:
    Sean Edwards

TEG Contact Details

  • Contact:

    Sean Edwards
    Ph: (07) 4061 8276
    M: 0403 213 714

    Contact Us
  • Offices:

    Innisfail – Nth Qld
    Townsville – Nth Qld
    Rockhampton – Nth Qld